How long
How long
roughly, should it take to replace the front clam?
It needs painted, but when I had the damage assessed the guy say one day or two days max to fix it.
Now the bird at Allied's telling me it's a minimum 7 working day job?
Is this right or are they just stretching it out?
I feel really bad now as my bro wanted to take it up to KH this sunday.
It needs painted, but when I had the damage assessed the guy say one day or two days max to fix it.
Now the bird at Allied's telling me it's a minimum 7 working day job?
Is this right or are they just stretching it out?
I feel really bad now as my bro wanted to take it up to KH this sunday.
Remember that they are a big place with a lot of traffic. The sad flipside of that is that they'll have to schedule things where there's time to do them. Therefore, you may have a 6 day wait for there to be time to allocate.
Just as long as they don't charge you 7 days, I'd say fair enough.
Just as long as they don't charge you 7 days, I'd say fair enough.
2010 Honda VFR1200F
1990 Honda VFR400 NC30
2000 Honda VTR1000 SP1
2000 Kawasaki ZX-7R
1990 Honda VFR400 NC30
2000 Honda VTR1000 SP1
2000 Kawasaki ZX-7R
Yes, but she called me about two weeks ago to book the car in and I had to get it to them at 4.30pm exactly yesterday. Presumably that's them scheduling in the work.Shug wrote:Remember that they are a big place with a lot of traffic. The sad flipside of that is that they'll have to schedule things where there's time to do them. Therefore, you may have a 6 day wait for there to be time to allocate.
Just as long as they don't charge you 7 days, I'd say fair enough.
Ah so, different story. Yell the arses off themSassy wrote:Yes, but she called me about two weeks ago to book the car in and I had to get it to them at 4.30pm exactly yesterday. Presumably that's them scheduling in the work.Shug wrote:Remember that they are a big place with a lot of traffic. The sad flipside of that is that they'll have to schedule things where there's time to do them. Therefore, you may have a 6 day wait for there to be time to allocate.
Just as long as they don't charge you 7 days, I'd say fair enough.
2010 Honda VFR1200F
1990 Honda VFR400 NC30
2000 Honda VTR1000 SP1
2000 Kawasaki ZX-7R
1990 Honda VFR400 NC30
2000 Honda VTR1000 SP1
2000 Kawasaki ZX-7R
Well just spoke to him, and all the usual aye buts and naw buts... and "I'm the professional here, naw you..." and it's a minimum of 7 working days now.
Apparently he's the Lotus expert, no one else, and only he knows how long it'll take and he's not about to itemise the ins and outs to someone who wouldn't understand anyway!
He also let slip they haven't even started work on it yet, and they've had it since yesterday afternoon.
*sigh
Apparently he's the Lotus expert, no one else, and only he knows how long it'll take and he's not about to itemise the ins and outs to someone who wouldn't understand anyway!
He also let slip they haven't even started work on it yet, and they've had it since yesterday afternoon.
*sigh
Phone back, speak to the workshop manager (nobody else) and go postal. If you were informed that it'd be a couple of days then it's not on for you to subsequently be told it's a large multiple of that!
Don't let them away with it - if we sit and swawllow this sh*t then it's all we'll get.
Don't let them away with it - if we sit and swawllow this sh*t then it's all we'll get.
2010 Honda VFR1200F
1990 Honda VFR400 NC30
2000 Honda VTR1000 SP1
2000 Kawasaki ZX-7R
1990 Honda VFR400 NC30
2000 Honda VTR1000 SP1
2000 Kawasaki ZX-7R